Stormwater Infrastructure Improvement, City of Fullerton, CA

Accord Engineering, Inc. was contracted by the City of Fullerton to provide stormwater infrastructure improvement at three locations involving the following services:

• Installation of over 1800 feet of RCP storm drain pipes with diameter ranging between 36 and 18 inches
• Installation and reconstruction of varies junction chambers, manholes, catch basins, and lateral pipe joints associated with the above storm drain pipes
• Reconstruction gas line, water main, and sanitary sewer structures in conflict with storm drain pipe construction

Challenges and Solutions
All three project sites were located in residential areas that do not allow over-night stockpiling of materials or equipment. Accord maintained a clean project site throughout the construction and received no complaint from the residents. The job site location also required implementation of strict work hour limitations. Accord completed the project on time and below the budget without incidents.
More pictures from this very important project